What to expect on your jobsite.
The equipment we bring, what each machine needs from your building, and how we keep the dust down. Written for contractors, facility managers and homeowners who like to know what is coming.



Commercial and industrial jobs.
Big slabs get the big machines. The grinder and the vac run together on one three phase circuit, so the first question we ask on a commercial job is where the panel is.
The Husqvarna PG 820 is a 970 lb, 17 horsepower planetary grinder with a 32 inch grinding width. The Husqvarna DC 5500 dust collector plugs into the building and the grinder plugs into the vac, so one 480 volt three phase 30 amp circuit runs both. The DC 5500 filters 99.9 percent of dust at 1 micron. The Lavina 20 handles edges, tight areas and smaller floors on 200 to 240 volt single or three phase power with a dedicated 30 amp breaker.
If the site has no three phase power, we bring generators. The PG 820 needs 25 kW on its own, or 45 kW when it runs with the DC 5500. A hose bib is helpful when the spec calls for wet grinding.
- Main grinder
- Husqvarna PG 820, 32 in, 970 lb
- Power
- One 480 V, 3 phase, 30 A circuit runs the grinder and the vac
- Dust collection
- Husqvarna DC 5500, grinder pigtails off the vac, 99.9% at 1 micron
- Second grinder
- Lavina 20, 200 to 240 V, 30 A dedicated breaker
- Without site power
- 25 kW generator, 45 kW with the DC 5500
- Coating removal
- SASE SC10E scarifier, 230 V single phase, 19 A
Equipment and power requirements.
For contractors and facility managers checking the electrical service before we arrive. Figures are from the manufacturers' specification sheets.
| Machine | Power | Amps | Weight | Notes |
|---|---|---|---|---|
| Husqvarna PG 820 planetary grinderLarge area grinding, coating removal, polishing | 480 V, 3 phase, plugged into the DC 5500 | 30 A circuit shared with the vac | 970 lb | 17 hp (12.5 kW), 32 in grinding width. Generator: 25 kW alone, 45 kW with the DC 5500 |
| Husqvarna DC 5500 dust collectorDust extraction for the PG 820 | 480 V, 3 phase, plugged into the building | 30 A circuit, runs the grinder too | 474 lb | 5.5 kW, 300 mbar, 99.9% filtration at 1 micron, built in phase correction |
| Lavina 20 (L20NE) planetary grinderEdges, tight areas, smaller commercial floors, all residential | 200 to 240 V, 1 or 3 phase | 30 A max, dedicated 30 A breaker | 584 lb | 7.5 hp (5.5 kW), 20 in working width, 57 ft cable. Generator: 16.5 kW |
| SASE SC10E scarifier, single phaseThick coating and material removal, up to 1 in deep | 230 V, 1 phase | 19 A | 240 lb | 5 hp (3.7 kW), 10 in cutting width |
| DiamaPro SVX3+A dust collectorDust extraction for the Lavina and hand tools | 110 V | Standard outlet | 183 lb | 3 motors, 285 CFM, ULPA 15 + PTFE filters, automatic filter cleaning |
| Power Horse 27,000 watt dual fuel generatorSite power for residential jobs and any site without three phase | Gasoline or propane | Runs the Lavina, the dust collector and the hand tools with no draw on the building |
Residential jobs.
We bring our own power. A garage job needs nothing from the house except a place to park the box truck and a cleared floor.
The Lavina 20 does the grinding, the SVX3+A dust collector keeps it clean with ULPA filters a step beyond HEPA, and a 27,000 watt dual fuel generator runs all of it. Your breaker panel stays out of it.
Expect a day or two on site, grinder noise for a few hours, and a floor you can walk on when we say so. Clear the garage the night before and we handle the rest.
- Grinder
- Lavina 20, 584 lb, 20 in working width
- Dust collection
- DiamaPro SVX3+A, ULPA 15 filters, automatic cleaning
- Power
- Our generator. Nothing needed from the house
- Noise
- Grinder running for a few hours
- Before we arrive
- Clear the garage the night before
Hand tools and the rest.
Both crews carry a full range of hand tools, so corners, edges, joints and repairs get the same attention as the open floor. We work out of a 25 foot Freightliner box truck, with trailers for material storage on larger jobs.
Hand grinders and edgers, crack chasers, mixing stations, notched squeegees and spiked rollers, spike shoes, moisture and temperature meters, and the layout gear for striping. Plus the small vacuum, the extension cords and the drop cloths that keep the rest of the building clean.
What we ask of the site
- Clear floor, with racking, product and vehicles moved off the work area
- Access to the panel on commercial jobs, or room for the generator
- A hose bib when the spec calls for wet grinding
- Agreed hours, so grinding runs when it suits the operation
- Somewhere to park the box truck, plus a trailer on larger jobs
Jobsite questions.
Do you need three phase power for a commercial job?
What does a residential job need from the house?
How much dust is there?
How loud is it?
Tell us about the site.
Tell us what you have and where it is. We will come look at it, tell you what it needs, and give you a number.
Or call (520) 381-9229
craig@proformancefloors.com